Key takeaways
-
Data centres consumed 485 TWh of electricity in 2025, up 17% on the year, and the IEA projects about 950 TWh by 2030, around 3% of global electricity demand.1
-
Hyperscale operators held 48% of worldwide data centre capacity at the end of 2025, and Synergy Research Group expects their share to reach 67% by 2031.6
-
The United States accounted for 45% of global data centre electricity consumption in 2024, China for 25% and Europe for 15%, according to the IEA.2
-
Vacancy in North America's primary data centre markets fell to a record low of 1.4% at the end of 2025, according to CBRE.11
Headline statistics
485 TWh
Data centres worldwide consumed 485 TWh of electricity in 2025, according to the IEA.
International Energy Agency, 2025
Cite this figure950 TWh
The IEA projects global data centre electricity consumption at about 950 TWh in 2030 in its Base Case, roughly double the 2025 level.
International Energy Agency, 2030
Cite this figure57%
Worldwide data centre capital expenditure rose 57% in 2025, according to Dell'Oro Group.
Dell'Oro Group, 2025
Cite this figure$1T+
Dell'Oro Group forecasts worldwide data centre capital expenditure to exceed $1 trillion in 2026.
Dell'Oro Group, 2026
Cite this figure48%
Hyperscale operators accounted for 48% of worldwide data centre capacity at the end of 2025, according to Synergy Research Group.
Synergy Research Group, 2025
Cite this figure45%
The United States accounted for 45% of global data centre electricity consumption in 2024, according to the IEA.
International Energy Agency, 2024
Cite this figure$9.2B
Equinix reported revenue of $9.2 billion in 2025, up 5% on the year.
Equinix (SEC Form 8-K, Exhibit 99.1), 2025
Cite this figureOverview
Data centres consumed 485 TWh of electricity in 2025, and spending on them is rising faster than at any point on record as companies build capacity for artificial intelligence (AI).1,3
A data centre houses the servers, storage and networking equipment that run cloud services, websites, enterprise software and AI models, together with the power and cooling systems they need. The market is served by three kinds of operator: hyperscalers (the largest cloud and internet companies, building for their own use), colocation providers that lease space and power to many tenants, and enterprises running their own on-premise facilities.
The International Energy Agency (IEA) estimates that data centre electricity consumption grew 17% in 2025 to 485 TWh, and that consumption by AI-focused data centres grew 50%.1 Dell'Oro Group reports that worldwide data centre capital expenditure (capex) rose 57% in 2025.3
The build-out is concentrated. The four largest US cloud providers, Amazon, Google, Meta and Microsoft, raised data centre capex by 76% in 2025, and Amazon, Microsoft and Google together hold 58% of all hyperscale capacity.3,7
Market size and growth
The IEA projects data centre electricity consumption to roughly double from 485 TWh in 2025 to 950 TWh in 2030, a compound annual growth rate (CAGR) of about 14%.1
Consumption rose from about 415 TWh in 2024, or 1.5% of global electricity use, to 485 TWh in 2025.2,1 In the IEA's updated Base Case it reaches about 950 TWh in 2030, around 3% of global electricity demand, and data centres account for slightly less than 10% of total electricity demand growth to 2030.1
AI is the main driver. The IEA expects consumption by AI-focused data centres to more than triple to about 465 TWh by 2030, as shipments of AI accelerators rise by a factor of 2.2 between 2025 and 2030.1
The IEA keeps the Base Case close to its 2025 projection of 945 TWh for 2030 because shortages of chips, memory and grid equipment limit near-term growth, even though investment and project pipelines point higher.1,2 Its 2035 range runs from 700 to 1,700 TWh across scenarios.2
Global data centre electricity consumption, 2024–2030
TWh
Global data centre electricity consumption rose from about 415 TWh in 2024 to 485 TWh in 2025, and the IEA projects about 950 TWh in 2030.
Source: International Energy Agency
Data table
| Period | TWh |
|---|---|
| 2024 | 415 |
| 2025 | 485 |
| 2030F | 950 |
- 17% Global data centre electricity consumption grew 17% in 2025, in line with IEA projections.1 Cite
- 415 TWh Data centres consumed about 415 TWh of electricity in 2024, around 1.5% of world electricity consumption.2 Cite
- 50% Electricity consumption by AI-focused data centres grew 50% in 2025, according to the IEA.1 Cite
- 465 TWh The IEA projects electricity consumption by AI-focused data centres at about 465 TWh in 2030, more than triple the 2025 level.1 Cite
Capital spending
Dell'Oro Group forecasts worldwide data centre capex to exceed $1 trillion in 2026 and reach $1.7 trillion by 2030, after growth of 57% in 2025.5,4,3
The IEA estimates that global data centre investment nearly doubled between 2022 and 2024, to about half a trillion dollars.2 It now puts the capex of five large technology companies above $400 billion in 2025, and says leading hyperscalers and neoclouds have announced a 75% increase for 2026, to $715 billion.1 Its projections imply cumulative data centre investment of $3.9 trillion between 2026 and 2030.1
Company filings show the scale:
- Amazon spent $131.8 billion on property and equipment in 2025 and expects about $200 billion of capex in 2026.20
- Alphabet spent $91.4 billion in 2025 and guided to $175–185 billion for 2026.21
- Microsoft's additions to property and equipment reached $115.9 billion in fiscal 2026, up from $64.6 billion.24
- Meta narrowed its 2026 capex outlook to $130–145 billion in July 2026.23
- Oracle's capex rose to $55.7 billion in fiscal 2026 from $21.2 billion.25
Equipment suppliers capture much of this spending. NVIDIA's data centre revenue rose 68% to $193.7 billion in its fiscal year to January 2026.19 Dell'Oro expects accelerated servers to account for about two-thirds of data centre infrastructure spending by 2030.4
- $1.7T Dell'Oro Group forecasts worldwide data centre capital expenditure to reach $1.7 trillion in 2030.4 Cite
- 76% Amazon, Google, Meta and Microsoft increased their combined data centre capital expenditure by 76% in 2025, according to Dell'Oro Group.3 Cite
- $0.5T Global data centre investment reached about half a trillion dollars in 2024, nearly double the 2022 level, according to the IEA.2 Cite
- $715B Leading hyperscalers and neoclouds announced capital expenditure of $715 billion for 2026, up 75% on 2025, according to the IEA.1 Cite
- $3.9T IEA projections imply cumulative global data centre investment of $3.9 trillion between 2026 and 2030.1 Cite
- $131.8B Amazon's purchases of property and equipment reached $131.8 billion in 2025, with most of the increase going to AI investment.20 Cite
- ~$200B Amazon expects to invest about $200 billion in capital expenditures across the company in 2026.20 Cite
- $91.4B Alphabet spent $91.4 billion on purchases of property and equipment in 2025.21 Cite
- $175–185B Alphabet guided to capital expenditures of $175–185 billion for 2026.21 Cite
- $115.9B Microsoft's additions to property and equipment reached $115.9 billion in the fiscal year to June 2026, up from $64.6 billion a year earlier.24 Cite
- $130–145B Meta expects 2026 capital expenditures, including finance lease payments, of $130–145 billion, according to its July 2026 outlook.23 Cite
- $55.7B Oracle's capital expenditures rose to $55.7 billion in the fiscal year to May 2026, from $21.2 billion a year earlier.25 Cite
- $193.7B NVIDIA's data centre revenue rose 68% to $193.7 billion in the fiscal year to January 2026.19 Cite
Segmentation by operator type
Hyperscale operators held 48% of worldwide data centre capacity at the end of 2025, against 32% for on-premise enterprise sites and 20% for colocation.6
Synergy Research Group counts 1,360 hyperscale data centres operated by 21 major cloud and internet companies at the end of 2025, with another 803 in the known pipeline.7 Nearly 60% of hyperscale capacity is in facilities the operators own; the rest is leased, much of it from colocation providers.6
The mix is shifting fast. On-premise capacity fell from 56% of the total in 2018 to 32% in 2025, and Synergy expects it to drop to 19% by 2031, while hyperscalers rise to 67%.6 Colocation capacity is still forecast to grow at near double-digit rates each year even as its share slowly declines.6
A new tier of AI-focused cloud providers, the neoclouds, is adding demand. Synergy puts their revenue above $25 billion in 2025 and forecasts it will approach $400 billion by 2031.10
Worldwide data centre capacity by operator type, end-2025
Share of total, %
- Hyperscale
- On-premise enterprise
- Colocation
Hyperscale operators held 48% of worldwide data centre capacity at the end of 2025, on-premise enterprise sites 32% and colocation 20%.
Source: Synergy Research Group
Data table
| Segment | % |
|---|---|
| Hyperscale | 48 |
| On-premise enterprise | 32 |
| Colocation | 20 |
Regional markets
The United States accounted for 45% of global data centre electricity consumption in 2024, China for 25% and Europe for 15%.2
| Region | Share of data centre electricity use, 2024 |
|---|---|
| United States | 45% |
| China | 25% |
| Europe | 15% |
| Rest of world | 15% |
The US lead is widening. Synergy counts 580 of the 1,360 operational hyperscale data centres and 437 of the 803 in the pipeline in the US, and expects total US data centre capacity to double in the next three years.7,8 About 45 GW of IT capacity is in the US pipeline.8 The US Department of Energy reports that data centres used 4.4% of US electricity in 2023, or 176 TWh, and projects 6.7–12% by 2028.12
Inside the US, new capacity is moving to where power is available. Texas and the Midwest held 33% of operational US hyperscale capacity at the end of 2025 but account for 53% of capacity coming online over the next few years.7 CBRE reports that primary-market vacancy in North America fell to a record low of 1.4% at the end of 2025, with Northern Virginia leading net absorption.11
The colocation market is less concentrated: ten metros, led by Northern Virginia at 7%, account for 41% of the worldwide colocation market, according to Synergy's 2025 data.9
Data centre electricity consumption by region, 2024
Share of total, %
- United States
- China
- Europe
- Other
The United States accounted for 45% of global data centre electricity consumption in 2024, China for 25% and Europe for 15%.
Source: International Energy Agency
Data table
| Segment | % |
|---|---|
| United States | 45 |
| China | 25 |
| Europe | 15 |
- 580 The United States had 580 of the world's 1,360 operational hyperscale data centres at the end of 2025.7 Cite
- 45 GW Around 45 GW of data centre IT capacity was in the US development pipeline in July 2026, according to Synergy Research Group.8 Cite
- 1.4% Vacancy in North America's primary data centre markets fell to a record low of 1.4% at the end of 2025, according to CBRE.11 Cite
- 2,497.6 MW North America's primary data centre markets recorded net absorption of 2,497.6 MW in 2025, a record, according to CBRE.11 Cite
Competitive landscape
Equinix and Digital Realty are the largest listed colocation operators, with 2025 revenue of $9.2 billion and $6.1 billion.13,14
Synergy names Equinix, Digital Realty, NTT, China Telecom, CyrusOne, GDS, KDDI and Chindata as the leading colocation companies.9 Equinix focuses on interconnected retail colocation in major metros and is expanding into large hyperscale campuses through its xScale joint ventures; it guided to 2026 revenue of $10.1–10.2 billion.13 Digital Realty, with more than 300 facilities in over 55 metros, ended 2025 with a backlog of $817 million of annualised rent and guided to 2026 revenue of $6.6–6.7 billion.14
In China, GDS Holdings grew revenue 10.8% to RMB11.4 billion in 2025, and VNET grew 20.5% to RMB9.95 billion, with 889 MW of wholesale capacity in service at year-end.15,16 Among diversified real estate investment trusts (REITs), American Tower's data centre segment grew 13.9% to $1.05 billion and Iron Mountain's grew 29.6% to $803 million.17,18
The largest buyers of capacity are also the largest builders. Hyperscalers own nearly 60% of their capacity, so the colocation operators compete with their biggest customers' own construction programmes.6
Largest listed data centre operators by 2025 data centre revenue
Ranked by data centre revenue, calendar 2025, us$ billion (rmb converted at rmb6.9931 per us$). Each figure is cited to the company's own disclosure or the source named.
| # | Company | Figure | Share |
|---|---|---|---|
| 1 |
Equinix
United States
Largest listed colocation operator, strongest in interconnection-rich retail colocation; guided to 2026 revenue of $10.1–10.2 billion. |
$9.2B13 | — |
| 2 |
Digital Realty
United States
Largest wholesale-focused operator, with 300+ facilities in 55+ metros and an $817 million leasing backlog at end-2025. |
$6.1B14 | — |
| 3 |
GDS Holdings
China
Largest listed independent operator in China, with 75.5% utilisation of its in-service area at end-2025. |
$1.6B (RMB11.4B)15 | — |
| 4 |
VNET Group
China
Fastest grower in this ranking at 20.5%, with 889 MW of wholesale capacity in service at end-2025. |
$1.4B (RMB9.95B)16 | — |
| 5 |
American Tower
United States
Data centre segment (CoreSite) revenue, up 13.9% in 2025 on demand for hybrid-cloud and AI workloads. |
$1.05B17 | — |
| 6 |
Iron Mountain
United States
Global data centre business revenue grew 29.6% in 2025, within a company best known for records storage. |
$0.8B18 | — |
Drivers and challenges
AI demand drives the market, while power supply, equipment shortages and financing set the pace of the build-out.1
Drivers
- AI training and inference. The power density of AI servers rose 11-fold between 2020 and 2025 and is set to quadruple again by 2027.1
- Hyperscaler and neocloud capex. The Top 4 US cloud providers raised data centre capex 78% in the first quarter of 2026, according to Dell'Oro.5
- Tight supply. North American primary markets absorbed a record 2,497.6 MW in 2025, and asking rents for 250–500 kW requirements rose 6.6% to $196.25 per kW per month.11
Challenges
- Power and grid access. The IEA estimates that about 20% of planned data centre projects could face delays if grid risks are not addressed, and lead times for transformers and cables have doubled in three years.2
- Component shortages. The IEA expects the shortage of high-bandwidth memory to last through at least the end of 2027.1
- Capital intensity. Cutting-edge AI data centres can cost $40,000–50,000 per kW, including IT equipment, and AI companies issued around $200 billion of debt in 2025.1
- Slower construction. Capacity under construction in North America's primary markets fell from 6,350.1 MW at the end of 2024 to 5,994.4 MW at the end of 2025.11
Trends and outlook
AI turns data centres into a trillion-dollar capex market
High confidenceDell'Oro reports 57% capex growth in 2025 and forecasts more than $1 trillion in 2026.3,5 The IEA counts $715 billion of announced 2026 capex by leading hyperscalers and neoclouds, up 75%.1 Amazon plans about $200 billion and Alphabet $175–185 billion for 2026.20,21
Outlook
Dell'Oro expects spending to reach $1.7 trillion by 2030, with accelerated servers taking about two-thirds of infrastructure spending.4
Hyperscalers become the majority owners of capacity
High confidenceHyperscale operators held 48% of worldwide capacity at the end of 2025, up from a much smaller base as on-premise fell from 56% in 2018 to 32%.6 Their 1,360 operational sites are matched by 803 more in the pipeline.7
Outlook
Synergy forecasts a 67% hyperscale share by 2031 and on-premise falling to 19%, leaving colocation providers increasingly dependent on hyperscale leasing.6
Power availability sets the pace of the build-out
High confidenceThe IEA warns that about 20% of planned projects could be delayed by grid constraints and that transformer and cable lead times have doubled.2 North American vacancy is at a record low of 1.4%, while capacity under construction fell from 6,350.1 MW to 5,994.4 MW during 2025.11
Outlook
The IEA expects renewables and gas together to supply more than 65% of data centre electricity by 2030, with onsite gas generation growing in the US.1
US capacity moves inland to power-rich states
Medium confidenceTexas and the Midwest held 33% of operational US hyperscale capacity at the end of 2025 but account for 53% of the capacity coming online in the next few years.7 Around 45 GW of IT capacity is in the US pipeline.8
Outlook
Synergy expects total US data centre capacity to double in three years, with growth concentrated outside traditional coastal hubs.8
Neoclouds add a new class of buyer
Medium confidenceOutlook
Forecasters expect spending and capacity to keep growing at double-digit rates through 2030, with power availability the main limit.1,4
The IEA's Base Case sees consumption reaching about 950 TWh in 2030, and the agency says the risks after 2030 lean to the upside as bottlenecks in chips and energy equipment ease.1 Dell'Oro's $1.7 trillion capex forecast for 2030 implies spending growth of about 14% a year from the roughly $1 trillion expected in 2026, and it expects the Top 4 US hyperscalers to account for about half of the total.4,5
Power supply will shape where capacity is built. The IEA projects that renewables will supply 360 TWh to data centres by 2030 and gas about 340 TWh, together more than 65% of the sector's electricity.1 Synergy expects hyperscale capacity to double in about three years.6
The main downside risk is financial. The IEA notes that 2026 capex will absorb almost all of the largest companies' cash generation and that equity investors have grown more cautious about returns on AI.1 Alphabet raised $49.6 billion of equity in June 2026, partly to fund AI infrastructure.22
Questions and answers
How big is the data centre market?
Data centres used about 485 TWh of electricity in 2025, roughly 1.5% of the world's power.1,2 In spending terms, Dell'Oro Group forecasts worldwide data centre capex will exceed $1 trillion in 2026 after rising 57% in 2025.5,3 The IEA estimated global data centre investment at about half a trillion dollars in 2024.2
How fast is the data centre market growing?
Who is the largest data centre company?
How much electricity do data centres use?
Cite this report
Quote any figure with attribution to MarketVerdicts and a link. Commercial reuse of charts and data needs a licence.
APA
MarketVerdicts Research Desk. (2026, August 17). Global Data Centre Market Report 2026. MarketVerdicts. https://marketverdicts.com/reports/data-center-market/
MLA
"Global Data Centre Market Report 2026." MarketVerdicts, 17 Aug. 2026, marketverdicts.com/reports/data-center-market/.
Chicago
MarketVerdicts Research Desk. "Global Data Centre Market Report 2026." MarketVerdicts, August 17, 2026. https://marketverdicts.com/reports/data-center-market/.
Sources
- 1. International Energy Agency. Key Questions on Energy and AI (full report) (April 2026). Intergovernmental bodies, accessed 29 Nov 2026.
- 2. International Energy Agency. Energy and AI: Executive summary (April 2025). Intergovernmental bodies, accessed 29 Nov 2026.
- 3. Dell'Oro Group. Data Center Capex Surges 57 Percent in 2025 as AI Deployments Accelerate (March 2026). Analyst firms, accessed 29 Nov 2026.
- 4. Dell'Oro Group. AI Boom Drives Data Center Capex to $1.7 Trillion by 2030 (February 2026). Analyst firms, accessed 29 Nov 2026.
- 5. Dell'Oro Group. AI Infrastructure Buildouts and Memory Cost Inflation Drove Data Center Capex Higher in 1Q 2026 (June 2026). Analyst firms, accessed 29 Nov 2026.
- 6. Synergy Research Group. Hyperscale Operators to Account for 67% of all Data Center Capacity by 2031 (April 2026). Analyst firms, accessed 29 Nov 2026.
- 7. Synergy Research Group. U.S. Hyperscale Investment Shifts Decisively Inland (April 2026). Analyst firms, accessed 29 Nov 2026.
- 8. Synergy Research Group. Synergy Reports that U.S. Data Center Capacity Will Continue to Balloon Despite Increasing Headwinds (July 2026). Analyst firms, accessed 29 Nov 2026.
- 9. Synergy Research Group. Tier Two Metro Markets are Reshaping the Colocation World (August 2025). Analyst firms, accessed 29 Nov 2026.
- 10. Synergy Research Group. Neocloud Market Forecast to Approach $400B by 2031, Driven by Surging AI Infrastructure Demand (April 2026). Analyst firms, accessed 29 Nov 2026.
- 11. CBRE. North America Data Center Trends H2 2025 (February 2026). Analyst firms, accessed 29 Nov 2026.
- 12. U.S. Department of Energy. DOE Releases New Report Evaluating Increase in Electricity Demand from Data Centers (December 2024). Government statistics, accessed 29 Nov 2026.
- 13. Equinix (SEC Form 8-K, Exhibit 99.1). Equinix Provides Robust 2026 Outlook Driven by Strong Fourth-Quarter Results and Accelerating Business Momentum (February 2026). Company filings, accessed 29 Nov 2026.
- 14. Digital Realty (SEC Form 8-K, Exhibit 99.1). Digital Realty Reports Fourth Quarter 2025 Results (February 2026). Company filings, accessed 29 Nov 2026.
- 15. GDS Holdings (press release via Stock Titan). GDS Holdings Limited Reports Fourth Quarter and Full Year 2025 Results (March 2026). Company filings, accessed 29 Nov 2026.
- 16. VNET Group (press release via Stock Titan). VNET Reports Unaudited Fourth Quarter and Full Year 2025 Financial Results (March 2026). Company filings, accessed 29 Nov 2026.
- 17. American Tower (SEC Form 8-K, Exhibit 99.1). American Tower Corporation Reports Fourth Quarter and Full Year 2025 Financial Results (February 2026). Company filings, accessed 29 Nov 2026.
- 18. Iron Mountain (SEC Form 8-K, Exhibit 99.3). Supplemental Financial Information, Fourth Quarter 2025 (February 2026). Company filings, accessed 29 Nov 2026.
- 19. NVIDIA (SEC Form 8-K, Exhibit 99.1). NVIDIA Announces Financial Results for Fourth Quarter and Fiscal 2026 (February 2026). Company filings, accessed 29 Nov 2026.
- 20. Amazon (SEC Form 8-K, Exhibit 99.1). Amazon.com Announces Fourth Quarter Results (February 2026). Company filings, accessed 29 Nov 2026.
- 21. Alphabet (SEC Form 8-K, Exhibit 99.1). Alphabet Announces Fourth Quarter and Fiscal Year 2025 Results (February 2026). Company filings, accessed 29 Nov 2026.
- 22. Alphabet (SEC Form 8-K, Exhibit 99.1). Alphabet Announces Second Quarter 2026 Results (July 2026). Company filings, accessed 29 Nov 2026.
- 23. Meta Platforms (SEC Form 8-K, Exhibit 99.1). Meta Reports Second Quarter 2026 Results (July 2026). Company filings, accessed 29 Nov 2026.
- 24. Microsoft (SEC Form 8-K, Exhibit 99.1). Microsoft Cloud and AI Strength Fuels Fourth Quarter Results (fiscal 2026) (July 2026). Company filings, accessed 29 Nov 2026.
- 25. Oracle (SEC Form 8-K, Exhibit 99.1). Oracle fourth quarter and fiscal year 2026 results (June 2026). Company filings, accessed 29 Nov 2026.
MarketVerdicts is independent. No company named in this report commissioned or paid for it. Read our editorial policy or report a correction.